Customization: | Available |
---|---|
After-sales Service: | Spare Parts |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Dough Sheeter Operation
1) Put down the conveying belt platforms at the 2 sides of the machine and the safety rack, and then turn on the power switch; |
2) Make the machine run with no load until its running is smooth, and then adjust the clearance of the rollers to a favorable value; |
3) Place the flour dough on the conveying belt and make it pressed by the rollers. Adjust the clearance of the rollers whenever the flour dough has been pressed until the thickness of the flour piece meets the requirement. |